MAJOR PROJECTS EXECUTED IN THE MENA REGION

The Company’s main activity abroad constitutes Roads, Water and Wastewater, Buildings, and Industrial Projects using Steel Structures, Precast Works, and Tilt-up method of construction.

The Works executed abroad were performed by our sister companies SiteCast General Contracting Company (SCGCC – 100% owned by GCC) in Dubai and Qatar; and Arabian Technical Construction Company (ATCC – 40% owned by GCC) in the Kingdom of Saudi Arabia.

Stores & Factory 001
Stores & Factory 001

press to zoom
Stores & Factory 002
Stores & Factory 002

press to zoom
Stores & Factory 007
Stores & Factory 007

press to zoom
Stores & Factory 001
Stores & Factory 001

press to zoom

AL KUHAIMI GROUP STORES AND FACTORY - INDUSTRIAL VILLAGE

Location:                              Dammam, KSA

Employer:                            Al Kuhaimi Metal Industries Co.

Description of Work:          Construction of 9333 m2 –steel structure consisting of 5,000 m2 factory, and the remaining area for Stores.
                                             In addition the works include the construction of office Building of 3 storeys of 2400 m2, 40,000 m2 of paved areas
                                             and 350 m of Precast Boundary Wall together with all finishing, Electro-Mechanical, overhead cranes and external
                                             works for the Project.

Contract Price (USD):        4,500,000

Start & Finish Dates:          From     15.01.2015         To           31.12.2016

Akoya Park 001
Akoya Park 001

press to zoom
Akoya Park 002
Akoya Park 002

press to zoom
Akoya Park 005
Akoya Park 005

press to zoom
Akoya Park 001
Akoya Park 001

press to zoom

AKOYA PARK - ROCHESTER, BELHAM, TRINITY CLUSTERS

Location:                              Dubai, UAE

Employer:                             Gulf Precast Co./DAMAC Crescent Properties Company LLC

Description of Work:           Construction of precast skeleton works using Tilt Up method of Construction for TH-M & TH-M1 Types of Four
                                              Villas Cluster totaling 34 clusters consisting of 68 Villas/TH-M and 68 Villas/TH-M1, and Three Villas Cluster totaling
                                              41 clusters consisting of 82 Villas/TH-M and 41 Villas TH-M1.

Contract Price (USD):          5,290,462

Start & Finish Dates:           From     01.11.2015         To           20.07.2016

QAK 001
QAK 001

press to zoom
QAK 002
QAK 002

press to zoom
QAK 007
QAK 007

press to zoom
QAK 001
QAK 001

press to zoom

AL KHOR ACADEMY

Location:                              Al Khor, Qatar

Employer:                            HBK Contracting Co. WLL/Qatar Foundation

Description of Work:          The scope of works covered included, Value Engineering, Structural Re-Design and Skeleton Construction of all
                                             56,000 m2 of precast buildings consisting of nine two story teaching clusters buildings in addition to an
                                             administration building. The Method used for construction was Tilt-Up.

Contract Price (USD):        18,361,690

Start & Finish Dates:         From     01.06.2015         To           15.03.2016

QAK Rec. Center 001
QAK Rec. Center 001

press to zoom
QAK Rec. Center 002
QAK Rec. Center 002

press to zoom
QAK Rec. Center 006
QAK Rec. Center 006

press to zoom
QAK Rec. Center 001
QAK Rec. Center 001

press to zoom

AL KHOR RECREATION CENTER

Location:                              Al Khor, Qatar

Employer:                            HBK Contracting Co. WLL/Qatar Foundation

Description of Work:          The scope of works includes, Value Engineering, Structural Re-Design for the whole building of a built up area of
                                             13,670 m2 and Skeleton Construction consisting of structural steel columns and beams for small spans and low
                                             roofs with Steel girders for spans of 25 & 30 m loaded on Insulated Tilt Up Load Bearing Walls for the Two Gyms,
                                             swimming pools and Cafeteria areas. Corrugated sheets and concrete topping and foams were used for roofs.

Contract Price (USD):         3,740,960

Start & Finish Dates:          From     01.04.2016         To           31.08.2016

QAW 001
QAW 001

press to zoom
QAW 002
QAW 002

press to zoom
QAW 008
QAW 008

press to zoom
QAW 001
QAW 001

press to zoom

AL WAKRA ACADEMY

Location:                              Al Wakra, Qatar

Employer:                            HBK Contracting Co. WLL/Qatar Foundation

Description of Work:          The scope of works includes, Value Engineering, Structural Re-Design for the whole building of a built up area of
                                             around 52,500 m2 and Skeleton Construction consisting of the use of insulated tilt walls for the envelope of the
                                             buildings, the interior structure consisted of solid tilt-up shear walls, precast columns, steel beams and joists
                                             topped by metal sheet decking and concrete topping. Structural steel girders and beams for recreation (spans up
                                             to 32m)  loaded on Insulated Tilt Up load bearing walls for the two gyms, swimming pools and Cafeteria areas.
                                             Corrugated sheets and concrete topping and foams were used for roofs.

                                             Duration for the Design-Build of Structure – 10 Months

Contract Price (USD):         12,359,250

Start & Finish Dates:          From     10.04.2017         To           31.02.2018