MAJOR PROJECTS EXECUTED IN THE MENA REGION

The Company’s main activity abroad constitutes Roads, Water and Wastewater, Buildings, and Industrial Projects using Steel Structures, Precast Works, and Tilt-up method of construction.

The Works executed abroad were performed by our sister companies SiteCast General Contracting Company (SCGCC – 100% owned by GCC) in Dubai and Qatar; and Arabian Technical Construction Company (ATCC – 40% owned by GCC) in the Kingdom of Saudi Arabia.

AL KUHAIMI GROUP STORES AND FACTORY - INDUSTRIAL VILLAGE

Location:

Employer:

Description of Work:

Contract Price (USD):

Start & Finish Dates:

Dammam, KSA

Al Kuhaimi Metal Industries Co.

Construction of 9333 m2 –steel structure consisting of 5,000 m2 factory, and the remaining area for Stores. In addition the works include the construction of office Building of 3 storeys of 2400 m2, 40,000 m2 of paved areas and 350 m of Precast Boundary Wall together with all finishing, Electro-Mechanical, overhead cranes and external works for the Project.

$4,500,000

From     15.01.2015       To         31.12.2016

AKOYA PARK - ROCHESTER, BELHAM, TRINITY CLUSTERS

Location:

Employer:

Description of Work:

Contract Price (USD):

Start & Finish Dates:

Dubai, UAE

Gulf Precast Co./DAMAC Crescent Properties Company LLC

Construction of precast skeleton works using Tilt Up method of Construction for TH-M & TH-M1 Types of Four-Villa-Clusters totaling 34 clusters consisting of 68 Villas/TH-M and 68 Villas/TH-M1, and Three-Villa-Clusters totaling 41 clusters consisting of 82 Villas/TH-M and 41 Villas TH-M1.

$5,290,462

From     01.11.2015       To         20.07.2016

AL KHOR ACADEMY

Location:

Employer:

Description of Work:

Contract Price (USD):

Start & Finish Dates:

Al Khor, Qatar

HBK Contracting Co. WLL/Qatar Foundation

The project consisted of nine two story teaching clusters and buildings in addition to an administration building, infrastructure, hard and soft landscape, finishing, and electro-mechanical works. The scope of works included Value Engineering, Structural Re-design, and Construction of all buildings. The Design and Construction of the Skeleton Works using the Tilt-Up method of Construction for the entire built-up area of 56,000 square meter was completed within nine months.

$18,361,690

From     01.06.2015       To         15.03.2016

AL KHOR RECREATION CENTER

Location:

Employer:

Description of Work:

Contract Price (USD):

Start & Finish Dates:

Al Khor, Qatar

HBK Contracting Co. WLL/Qatar Foundation

The scope of works includes Value Engineering, Structural Re-Design for the whole building of a built up area of 12,700 square meter, and Skeleton Construction consisting of structural steel columns and beams for small spans and low roofs with Steel girders for spans of 25 & 30 m loaded on Insulated Tilt Up Load Bearing Walls for the Two Gyms, swimming pools and Cafeteria areas. Corrugated sheets and concrete topping and foam-concrete were used for roofs.

$3,740,960

From     15.08.2016       To         15.12.2016

AL WAKRA ACADEMY

Location:

Employer:

Description of Work:

Contract Price (USD):

Start & Finish Dates:

Al Wakra, Qatar

HBK Contracting Co. WLL/Qatar Foundation

The scope of works includes, Value Engineering, Structural Re-Design for the whole building of a built up area of around 52,500 square meter and Skeleton Construction consisting of the use of insulated tilt walls for the envelope of the buildings, the interior structure consisted of solid tilt-up shear walls, precast columns, steel beams and joists topped by metal sheet decking and concrete topping. Structural steel girders and beams for recreation (spans up to 32m)  loaded on Insulated Tilt Up load bearing walls for the two gyms, swimming pools and Cafeteria areas.
Corrugated sheets and concrete topping and foam-concrete were used for roofs.

Duration for the Design-Build of Structure – 10 Months

$12,359,250

From     10.04.2017       To         01.03.2018